3D Technologies
-
Vanderohe, A. (March 2013). 3D Technologies Implementation Plan. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center.
-
Vonderohe, A. P. (March, 2012).
Implementation of 3D Technology and Development of AMG Specifications for Placement of HMA Base Course Material.
Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center (42 pages, 770 KB).
-
Vonderohe, A. P. (May, 2009).
Status and Plans for Implementing 3D Technologies for Design and Construction in WisDOT.
Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center (129 pages, 5 MB).
-
Vonderohe, A. P. (May, 2009).
WisDOT Implementation Plan: 3D Technologies for Design and Construction.
Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center (17 pages, 276 KB).
GPS and Highway Construction Equipment
-
Thomas J. Martinelli (February 28, 2013).
Constructability Review of the Safety Edge Construction Technique: 2012 WisDOT Pilot Projects (97 pages, 6 MB). [Searchable and accessible version (97 pages, 7 MB).]
-
Thomas J. Martinelli and Gary C. Whited (December, 2011).
Constructability Review of the Safety Edge Construction Technique: 2011 WisDOT Pilot Projects (57 pages, 2 MB).
-
Vonderohe, A. P. (February 2009). Implementation of GPS Controlled Highway Construction Equipment Phase III. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center (122 pages, 5 MB).
-
Vonderohe, A. P. (January 2008). Implementation of GPS Controlled Highway Construction Equipment: Phase II. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center (100 pages, 5 MB).
-
Vonderohe, A. P. (April 2007). Final Report: Implementation of GPS Controlled Highway Construction Equipment. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center (103 pages, 4 MB).
Materials Reports
-
Wacker, J.P., Kretschmann, D.E., Wang, X., and Rammer, D.R. (November 2010).
Condition Assessment of Treated-Timber Guardrail Posts.
Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center (71 pages, 3.3 MB).
Measuring Pavement Thickness
Owner Controlled Insurance Programs
-
Kwon, S. K., Rappold, A., Kang, K., and Permut, Ben. (July 2007). Evaluation of Owner Controlled Insurance Programs (OCIP's) for Use on WisDOT Mega-Corridor Projects: A Review of the Marquette Interchange Owner Controlled Insurance Program, Final Report. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center (38 pages, 286 KB).
Project-level Communications
Project-level Management
-
Whited, G. C., Pashouwer, J. J. (October 2010). Evaluation of WisDOT's Consultant Design/Construction Transparency Effort. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center (129 pages, 4.3 MB).
- Whited, G. C., Hanna, A. S., Kavanaugh, J., and Tadt, E. (March 2012). Best Practices from WisDOT Mega and ARRA Projects, Final Report. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center. (60 pages, 2.055 MB).
- Whited, G. C. and Hanna, A. S. (March 2012). Best Practices from WisDOT Mega and ARRA Projects - Best Practice Catalog, Final Report. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center. (100 pages, 925 KB).
- Whited, G. C., Hanna, A. S.,and Tadt, E. (March 2012). Best Practices from WisDOT Mega and ARRA Projects - Request for Information : Benchmarks and Metrics, Final Report. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center. (134 pages, 2.874 MB).
- Kavanaugh, J. and Whited, G. C. (March 2012). Best Practices from WisDOT Mega and ARRA Projects - Statistical Analysis and % Time vs. % Cost Metrics, Final Report. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center. (137 pages, 2.554 MB).
- Thompson, B. P. and Whited, G. C. (February 2012). Evaluation of WisDOT's Local Program Management Consultant Program, Final Report. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center. (68 pages, 1.19 MB).
PS&E (Plans, Specifications, and Estimate) Estimate
-
Vanderohe, A. (March 2013). Executive Summary: Wisconsin Department of Transportation Technologies Implementation Plan. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center.
-
Hanna, A. S., Whited, P. E., and Menke, R. (August 2007). Final Report: Improved Construction Cost Estimating Procedures for Developing the PS&E Estimate at WisDOT. Madison, WI: University of Wisconsin-Madison, Construction Materials and Support Center (106 pages, 1.5 MB).
Rapid Repairs
Accessibility: Please contact whited@engr.
wisc.edu for alternative formats or source data for graphics.
|